• pjusk@lemmy.dbzer0.com
    link
    fedilink
    English
    arrow-up
    2
    ·
    7 days ago

    Not happy about seeing that 😑 As much as it sucks, these days its not possible to avoid vibe coded projects.

    At least Windscribe have been audited (last in 2024 afaik), so at least some confidence there. Personally, would also rather stick with this over Mullvad in light of the recent news, each to their own there ofc.

    Been looking at IVPN for a while and did consider switching to it but Windscribe had way better deals so it was an easier choice then and there. Will think twice when have to renew.