fubarx@lemmy.world to Technology@lemmy.worldEnglish · 7 days agoElon Musk’s Colossus 2 data center installed 59 natural gas turbines without permission, report claims — thousands of tons of pollutants reportedly impact black communities in Mississippi already suffwww.tomshardware.comexternal-linkmessage-square156linkfedilinkarrow-up11.26Karrow-down113 cross-posted to: fuck_ai@lemmy.worldcollapse@lemmy.zip
arrow-up11.25Karrow-down1external-linkElon Musk’s Colossus 2 data center installed 59 natural gas turbines without permission, report claims — thousands of tons of pollutants reportedly impact black communities in Mississippi already suffwww.tomshardware.comfubarx@lemmy.world to Technology@lemmy.worldEnglish · 7 days agomessage-square156linkfedilink cross-posted to: fuck_ai@lemmy.worldcollapse@lemmy.zip
minus-squaredeft@lemmy.wtflinkfedilinkEnglisharrow-up8·6 days agoYes. I’m pretty sure it’s a contractor’s job to get the permits. Is it not? Not removing blame from Elon. Just smearing the blame around cause all those fucks are responsible
Yes. I’m pretty sure it’s a contractor’s job to get the permits. Is it not?
Not removing blame from Elon. Just smearing the blame around cause all those fucks are responsible