Today’s progress on the library. I got most all of the cutting done, and assembled the pedestal base and the rail. Next up is assembling the lower uprights and running the Ethernet. Then pulling the trim, installing the actual shelves, trim and paint.
And at some point I’ll get the ladder installed.
So many crosscuts!
The pedestal is made of 2x10, with cross members to support the cabinets. The pvc is conduit for Ethernet.
The rail frame is the same, just out of 2x4.
Cleaned up shop at the end of the day.